2020 Data Center

Project Name: 2020 Data Center
Project Location:Seattle, WA

AUE was called on to design both the interior and exterior metal stud framing for this essential facility located in downtown Seattle. As an essential facility this increased the design of seismic and wind loading required which went as high as 62 psf on the parapets. Also included in the design was wall detailing to allow for high floor to floor drifts of up to 4”.